Testing should be done on a random sampling basis with a minimum of five tests per lot (agency requirements define a “lot” as “A day’s or full day’s production”). The average of the five density determinations should be equal to or greater than:
96% of lab density with no test less than 94%
92% of maximum theoretical with no test less than 90%.
99% of the control strip density

